Skip to content
FAM Plumbing

Bathroom Renovation and Fit-Out Plumbing in Dubai

A renovation or a fit-out is a sequence of trades, and the plumbing is the one that has to be right before the others can close the wall. FAM Plumbing does the plumbing on bathroom renovations and on new villa and apartment fit-outs and handovers in Dubai.

  • Workmanship guarantee
  • Open 24/7
Smiling plumber in blue overalls holding a clipboard in a kitchen

Bathroom renovation and fit-out plumbing in Dubai: what we do

  • Bathroom renovation plumbing: stripping out and isolating the old supply and waste, moving fixtures, running new pipework and fitting the new suite.
  • First fix for new fit-outs and handovers: supply, hot water and waste pipework run to the drawings before walls and ceilings close.
  • Second fix: fitting the fixtures, valves and connections after the finishes, and commissioning them.
  • Tests at each stage, with a written record and photographs before anything is covered.
  • Snagging: finding plumbing defects in a newly handed-over home and fixing what is ours to fix, or writing up what is the developer's.
  • Records for the landlord, the building and the next contractor.

The individual fixtures and systems have their own pages: shower installation, bathtub installation, toilet installation, bathroom basin, tap installation, water heater installation and repiping and fit-out supply lines. This page does not repeat them. It is about the project around the fixtures: the order of work, the drawings, the tests, the contract and the handover.

What the plumber does on a renovation, and who else is on site

A bathroom renovation or a fit-out can be organised in three ways, and the plumbing sits differently in each.

Way of organisingWho holds the plumbingWhat to ask
Plumbing company leads the bathroomThe company that does the pipework also plans the sequence and brings in the other tradesWhich trades it carries out itself and which it subcontracts, and who is responsible for each
Fit-out or renovation contractor leadsThe plumbing is a subcontract inside a larger priceWhether the plumbing is priced as a separate line, fixed or provisional, and who tests it
You manage the tradesYou hold each contractWho decides when a trade has finished and who pays for a wall opened twice

On our own jobs we carry out the plumbing, the electrical work and the civil work, such as breaking out and making good, with our own teams. Finishes such as tiling and joinery are agreed job by job, and the quote says who does what.

In all three set-ups, the plumber is the trade whose work is hidden by every other trade's finish. That is why the tests below happen at the plumbing stage, before the tiler arrives.

First fix and second fix: what the words mean

First fix is the pipework put in before plastering, screeding and tiling: supply, hot water and waste pipework, the soil stack and the stubs that fixtures will connect to. Second fix is what happens after the finishes: sanitaryware, radiators, appliance connections, filling and commissioning. Worth fitting at first fix are quarter-turn isolation valves on the hot and cold supplies to each fixture or room, and a check valve where backflow protection is needed. Our backflow prevention page covers when.

First fixSecond fix
WhenBefore the walls and floor are finishedAfter the finishes are on
WhatSupply and waste pipework, isolation valves, stubs for fixtures, drain connectionsSanitaryware, taps, valves, trim, appliance connections
TestPressure test of the supply and a water test of the waste, before closingLeak check with every fixture connected, then commissioning
What goes wrong if rushedA leaking joint behind finished tileA fixture that does not fit the rough-in

The split itself, hidden work first and visible work after, applies to any building.

The order of work in a bathroom renovation

Our own order for a new concealed shower, with its waterproofing and flood test, is on the shower installation page.

StageWorkCheck before moving on
1Survey, drawings and a fixture schedule. Agree what goes whereEvery fixture chosen, with its rough-in dimensions
2Approvals. Landlord and building managementIn writing, before demolition
3Isolate and strip. Close the supply, remove the old suite and finishes, protect the floors and common areasWhat is behind the wall is recorded
4First fix. New supply, waste and valvesPressure test and waste water test, recorded
5Close and prepare. Board or plaster, then waterproofingFlood test before the tile. See the shower page
6Tile and groutCure times per the product
7Second fix. Fixtures, taps, trim, shower valve trimTest-fit before grouting where the fixture fixes to tile
8Commissioning. Hot and cold, flow, drains, leaksEvery fixture run, and a written note
9Snagging and handoverA list of defects, closed one by one

Two points on the order. The waste water test and the pressure test come at stage 4, when a leak means opening one wall and not rebuilding a finished room. And the second-fix fixtures cannot be chosen at stage 7, because their rough-in dimensions decide where the first-fix pipes stop at stage 4, which is why the fixture schedule is stage 1.

How long it takes

We do not quote a standard number of weeks, because the time depends on the scope. These are the things that set it:

  • How many bathrooms and whether fixtures move. A like-for-like swap is quick. Moving the toilet or the shower drain opens the floor.
  • Approvals. The building's permit and permitted working hours.
  • Waterproofing and tile cure times. They are set by the product, and the flood test needs its time too.
  • Delivery of fixtures. First-fix pipes cannot be finalised until the fixtures and their rough-in data are chosen.
  • Other trades. Tiling, electrics and joinery have to fit in the sequence.

After the survey, the written quote includes a programme by stage.

Moving fixtures: what the layout decides

Keeping the toilet, basin and shower where they are is the cheapest bathroom.

Supply pipes run under pressure and can change direction freely. Waste pipes run by gravity, so they need a fall, a connection to the stack and a route through the floor or wall, and the position of the drain limits the move.

ChangeWhat it touchesWho needs to agree
Swap a fixture in the same placeThe supply stub and the waste connection, if the new fixture matchesLandlord, if rented, and the building if it needs work permission
Move a basin or a bath a short wayNew supply and waste runs, and the finish in betweenLandlord and building management
Move the toiletThe soil connection and the floor around it. The outlet types are on toilet installationLandlord and building management. Ask in writing
Move or enlarge the showerThe floor build-up, the drain and the waterproofing. See shower installationAs above
Add a bathroomA new supply and waste, new load on the building's systemBuilding management, who decide whether the building can take the load

The drawings and the fixture schedule

The cheapest mistakes are made on paper. Before any wall is opened, the plumbing company and the customer should have written down:

  1. A fixture schedule: every fixture, tap, valve and accessory, with the make, model and finish chosen.
  2. The rough-in data from the maker, such as the shower valve's template and depth, the toilet's outlet type and the basin's tap-hole count. A first-fix pipe stops where the second-fix fixture needs it, so the fixture comes first.
  3. Finished dimensions: tile thickness, floor build-up, heights and clearances.
  4. A marked plan of where each pipe runs, where each isolation valve sits and where an access panel is needed.

Tests and records at each stage

The test detail is on other pages: repiping for the pressure test of supply pipework, drain repair for waste, and shower installation for the flood test of waterproofing.

StageTestWhat to know
First fix, supplyPressure test with water at working pressure, with the gauge and joints watchedDone before anything is covered. A falling gauge is a leak
First fix, wasteWater test of the waste pipework, with a check of the fallsSlow draining here means opening a wall
WaterproofingFlood test of the wet areaBefore the tile goes on
Second fixLeak check with every fixture connectedLook under and behind each fixture
At handoverEvery outlet run, hot and cold, and every drain runSee the snagging list below

Each test is written down with the date, the result and a photograph of the gauge or the water level. Without a record, the customer cannot show a landlord, a building manager or an insurer what was tested before the tile went on.

Warranty stamp on paperwork

New villa and apartment plumbing: the fit-out

A new home has a developer's plumbing already in it, and a fit-out or renovation adds the owner's. The line between them matters when something leaks.

Fit-out plumbing is first fix and second fix to someone's drawings, with approvals first. Most managed buildings require approval from the developer, owners' association or facility-management company before noisy or intrusive work, and a submission may include insurance, a schedule, a method statement, drawings and a deposit. Resolve approvals before demolition or non-refundable material orders. Our repiping page has the supply-line side of fit-outs for shops, offices and restaurants: routing to drawings, isolation by zone and an as-fitted drawing.

For a villa or apartment, the work divides into three parts.

PartWhat it includesWho holds it
Developer's installationThe risers, the connection to the tank or the main, the original stubsThe developer, while the handover period lasts
Your fit-outNew or moved pipework, fixtures, a water heater, filtersThe contractor you hire
Building servicesCommon tanks, pumps, risers and drainsBuilding management or the master developer

The fit-out contractor should record the condition of what it connects to before it connects, with photographs, so a later fault can be placed on one side of the line.

Snagging a newly handed-over home

When a villa or apartment is handed over new, the developer is usually responsible for defects for a period after handover. Check your sale contract and handover documents for the period and the process, and report every plumbing defect to the developer in writing, with photographs and dates, and keep a copy. We are plumbers, not lawyers, so this is general information.

A plumbing snag list

Permission in Dubai: who decides on a renovation

  • The building. Managed buildings set their own rules for work hours, permits, deposits and protection of common areas.
  • The landlord. In a rented home, moving fixtures or changing the wet floor needs written consent.
  • The owner. The owner is responsible for the private drainage and pipework of the unit, so changes to it are agreed with the owner.

Where a job falls:

JobStarting point
Replace fixtures in the same placesMaintenance or a light alteration. Tell the landlord and the building in writing
Move fixtures or change the wet floorWritten landlord consent and building approval
New bathroom or extra wet areaAs above, and building services must take the load
Work in a shared riser, shaft or ceiling voidBuilding management decides access and timing

We cannot say whether your building needs a permit or a certificate for a given job. Building management can, and a request in writing is cheaper than a stopped job. Tell us what your building asks for and we work to it.

What to check in a renovation quote

If you are still deciding who to hire for plumbing in general, how to choose a plumber in Dubai covers listings, call-out fees and questions to ask. This section is about a renovation quote in particular.

CheckWhat to do
The companyAsk for the company name, a number you can call back and examples of bathrooms it has finished. Look at a finished one if you can
Documents a building asks forAsk the building what it needs, such as insurance, a schedule, a method statement and drawings, and ask the company whether it can supply them
Who does the workAsk which trades are the company's own people and which are subcontracted
Written scope and priceAn itemised quote, with what is fixed, what is provisional and what is excluded
Test recordsAsk what is tested at each stage and whether you get the record
WarrantyAsk for it in writing, with the period and what it covers

If something goes wrong

Keep the signed scope, every variation in writing, the payment record, the test records and dated photographs. Any complaint, insurance claim or dispute will ask for them.

Quotes, variations and payment

A plumbing quote is only comparable with another if both say what is included.

ClauseWhat to ask
ScopeThe list of what is in the price, with exclusions
Fixed or provisionalWhich lines are fixed and which are allowances that will change
VariationsHow a change is priced and approved, before the work, in writing
Payment stagesTied to stages and not to dates
RetentionWhether any money is held back until snagging is closed
Working hours and building rulesPermitted hours, protection of common areas, prohibited changes
WarrantyPeriod and cover, in writing

Payment schedules

Tie each payment to a recorded test or a signed stage and not to a date. A first payment released when the first-fix pressure test is passed and photographed, for example, gives both sides the same evidence. Be wary of a request for full payment upfront.

Warranty and the handover

What you should have at the end of a plumbing project:

  • The signed scope and every variation, with the final price against the quote.
  • The test records: date, test, result and photographs of the gauge or the water level, from first fix and from the flood test.
  • A marked plan of where pipes run behind the finishes, photographed before they were covered.
  • A valve map: which valve isolates which fixture, the zone and the whole bathroom.
  • The fixture schedule with the makers' details, the installation sheets and the warranty documents for the fixtures, so a later repair can find the part.
  • A snag list with each item closed and dated.
  • The removed items you asked to keep.
  • FAM's workmanship warranty, in writing. The warranty runs for 30 days and covers our labour only. Parts carry the manufacturer's warranty only.

How we work

  1. You tell us what you are doing: the property, whether you own or rent, what is moving and what is staying, and any drawings.
  2. We survey the bathroom or the unit and record the existing pipework, valves and drains where we can see them.
  3. We agree the drawings and the fixture schedule, with rough-in data from the makers.
  4. We give a written, itemised price, with what is fixed, what is provisional and what is out.
  5. Check permission. In a rented or managed property, ask the landlord or building management whether they need to approve this work before the visit.
  6. We carry out first fix, test and record it, then second fix, test and record it.
  7. We commission, snag and hand over the records, the plan and the valve map.

Where we work in Dubai

We cover all of Dubai, including Dubai Marina, JBR, Downtown Dubai, Business Bay, Jumeirah Lakes Towers, Palm Jumeirah, Al Barsha, Jumeirah Village Circle, Dubai Hills, Mirdif, Deira and Al Quoz. See the full list of areas.

Planning a renovation so the plumbing does not hold it up

Plumbing sits at the start and end of a bathroom or kitchen job, which makes it the trade that most often sets the programme. A few decisions made early save weeks.

  • Fix the fixture list first. Taps, mixers, shower valves, toilets and basins come in many shapes with different connections. A shower valve fitted before the tile and not matched to the trim has to be taken out again.
  • Order long-lead items early. Imported mixers, concealed cisterns and special valves can take weeks. Late deliveries stop the second fix.
  • Settle the positions. Moving a toilet or a drain changes the floor, the slab and the neighbours' ceiling. Decide before the tiler starts.
  • Agree who supplies what. Say who buys the taps, the waste, the flexible hoses and the sundries. Gaps between the supplier and the fitter cause delays.
  • Book the water shutoff with building management, with enough notice, and tell neighbours.
Smiling plumber kneeling at a basin cabinet with the pipework exposed

What can go wrong on a fit-out, and how to prevent it

ProblemWhy it happensHow to avoid it
A leak found after the tiles go onThe pipework was not tested before closingTest every concealed pipe under pressure and record it before tiling
A shower valve in the wrong placeThe tile layout was not checked against the valveMark the valve and tile layout together
A toilet that will not sit rightThe floor was raised or the outlet movedCheck the floor level and outlet before tiling
Slow drains in a new bathroomPoor fall, a kinked waste or debris left in the pipeCheck the fall and flush the line before fitting
Noise in a wallPipes touching the structure with no clips or sleevesUse clips and sleeves, and lag where needed
Hot water slow to arriveA long run, or a pipe of the wrong sizePlan the heater and the run together
A ceiling stain belowA leaking waterproofing layer or a bad waste jointTest the waterproofing by flooding before tiles

Working with the other trades

On a renovation, the plumber is one of several: tiler, electrician, carpenter, painter, ceiling contractor. We have our own electricians and do civil work in-house, which means fewer hand-offs on a typical bathroom or kitchen. Even so, the trades need an order, and someone must keep it.

  • Plumber first fix after the walls are stripped and the layout fixed.
  • Electrician first fix alongside.
  • Waterproofing and screed, after the pipework is tested.
  • Tiling, after the waterproofing has cured and been tested.
  • Plumber and electrician second fix, after the tiling, to fit the sanitary ware, taps, lights and sockets.
  • Final clean and snagging.

Skipping the test between stages is the commonest mistake, because a leak found at the end means breaking the finish.

What the old bathroom hides

The first day of a strip-out often shows more than the survey could. Common finds are corroded isolation valves that will not close, old pipe that has been patched more than once, waste pipes with too little fall, a floor that is not level, and a leak that has been wetting the slab for years. None of these is rare in older Dubai flats and villas. We photograph what we find, tell you the same day and give you the price of dealing with it before we do. A renovation priced without a survey leaves these as surprises, so we ask to see the bathroom first.

Working in an occupied flat

If you live in the flat while the work goes on, plan for a time with no bathroom and sometimes no water. We agree the water shutoff hours with you and with building management, and we turn the supply back on at the end of each day wherever the work allows it, so the kitchen and the other bathroom keep working. Dust and noise are real, so floors, doors and furniture are covered and the work stays inside the building's permitted hours. If there is only one bathroom, ask for a plan with the shortest time without it, and say if someone in the home needs the bathroom at certain hours.

Looking after the building

A tower has lifts, corridors and neighbours. Managed buildings usually want the lift padded, the corridor protected and the debris taken out by a set route and at set times. Our own civil team does the breaking out and clearing, so the same crew that opens the wall is responsible for protecting what is around it. Ask building management for the rules before the work starts, and give us a copy so we plan the programme around them.

Planning the water shutoff

Pipework changes need the water off, and in a flat that often means the riser serving other units. Book the shutoff with building management with enough notice, and ask how long they will allow. We plan first-fix work so the isolation of the riser is as short as it can be, and where the building has an isolation valve for your flat alone we use it. If a shutoff is not possible at all, tell us before we quote, because it changes the method.

What can reasonably be expected from a fit-out plumber on site

A good plumbing team on a fit-out works to a plan, keeps the site tidy and communicates early. Here is what you can reasonably expect:

  • Before starting, a walk-through of the property, a list of fixtures, and a written scope with the price fixed.
  • During first fix, pipes run neatly, supported and labelled, with isolation valves where they are needed, and photos of the work before it is covered.
  • After first fix, a pressure test with a record, and an inspection by you or your project manager before closing up.
  • During second fix, fixtures fitted level and sealed, with the supplies and wastes tested.
  • At handover, a walk-through, a list of valve positions, any manuals and the warranty terms.

Expect honest answers when something is not possible. A drain that cannot be moved, a wall that cannot hold a wall-hung toilet or a pressure that cannot support a rain shower are problems best raised early. If a variation is needed, you should hear the price before the work is done. Our warranty is 30 days on workmanship, covering labour only, and parts carry the manufacturer's warranty only. Prices exclude 5% VAT.

How much does bathroom and fit-out plumbing cost in Dubai?

The plumbing share of a renovation varies too widely to give as a rule, so we price it after a survey.

  • The visit. AED 50 + VAT, credited if the work goes ahead.
  • General plumbing work charged by the hour. From AED 120 + VAT, though most renovation work is priced by the stage.

What sets the price on a renovation

  • Days on site and the trades involved.
  • How much moves. A like-for-like swap against a moved toilet or shower drain.
  • Building rules. Permitted hours, protection of common areas and any deposit.
  • Fixed against provisional lines. Provisional sums move.
  • Materials and who supplies them.

We do not publish a starting price for this job. Send a photo on WhatsApp and we give you a fixed, itemised price before we start. Prices exclude 5% VAT.

Bathroom renovation plumbing FAQs

What does the plumber do on a bathroom renovation?

It isolates and strips the old supply and waste, runs the new pipework before the walls close, tests it, and fits and commissions the fixtures after the finishes. Other trades do the tiling, electrics and joinery. The sequence is set out above.

What are first fix and second fix?

First fix is the pipework put in before plastering and tiling: supply, waste and valves. Second fix is the fixtures and connections after the finishes. See the table above.

Do I need permission to renovate a bathroom in Dubai?

Almost always yes, if the building is managed, and in writing from the landlord if you rent. Ask building management what it requires, such as a work permit, a deposit and permitted hours, before demolition. See the permission section above.

How much does a bathroom renovation cost in Dubai?

The cost depends on the size of the bathroom, the fixtures you choose, the tiling and how much of the plumbing has to move. After a visit we give a fixed price on WhatsApp that covers the plumbing and the building work together. Prices exclude 5% VAT.

How do I check a renovation contractor before I sign?

Ask for the company name, a number you can call back, an itemised written scope and examples of finished bathrooms. Ask which trades are its own people. See the table in the quote section above.

How should I pay for the work?

Tie payments to recorded stages, such as a passed first-fix test, and not to dates. Be wary of a request for full payment upfront. Our quote sets out the stages.

What tests should be done before the tiles go on?

A pressure test of the new supply and a water test of the waste, both recorded, and a flood test of the waterproofing in wet areas. See shower installation.

Who is responsible for plumbing defects in a new villa or apartment?

Usually the developer, for a period after handover. Check your sale contract for the period, and report defects in writing, with photographs, as soon as you find them.

What if I have a dispute with the contractor?

Keep the signed scope, variations, payment record, test records and dated photographs, and raise it in writing first. We keep our own test records and hand them over for exactly this reason.

Book bathroom or fit-out plumbing in Dubai

Call or send a message with the property, whether you own or rent, what you want to move, any drawings and the fixtures you have chosen. Photographs of the existing bathroom and the building's work rules help. We will survey, agree the fixture schedule, and give you a price in writing.

WhatsApp: +971 55 407 7427 · Request a quote

Visit us: Office 871, Oasis Mall, Al Quoz 1, Dubai, UAE

Related services: Shower installation · Bathtub installation · Toilet installation · Bathroom basin · Repiping · Water heater installation · Leak detection · Plumbing maintenance · Emergency plumber