Several shower problems start before the shower is switched on. The valve was set too deep, so the trim will not sit flat. The heater cannot supply a large rain head. The floor was tiled before anyone tested the waterproofing. The landlord was not asked. FAM Plumbing installs showers in flats, villas, offices and shops across Dubai, from a new mixer and head set to a concealed valve, a rain shower or a walk-in with a floor drain.

  • Workmanship guarantee
  • Open 24/7
Old bathroom with a worn tub and a shower curtain

Shower installation in Dubai: what we do

  • Mixer, bar and head-set replacement. A new exposed mixer, rail, hand shower or rain head on the existing pipework.
  • Concealed valve installation. The valve body set in the wall, the trim fitted, and the wall closed with an access plan.
  • Rain showers and columns. Ceiling or wall-arm heads, and column or panel units, checked against the flow and pressure they need.
  • Trays, walk-ins and wet-room floors. The drain connection, the fall, the waterproofing and the flood test.
  • Isolation valves. A valve for the shower so a repair does not shut off the flat.
  • Hot water and pressure check. Whether the heater and the supply can feed the shower you have chosen.
  • Testing and commissioning. Pressure test, flood test, temperature check and a written handover.
  • Advice on permission. What to ask the landlord and building management before work starts.

Neighbouring topics have their own pages. Faults on an existing shower, including cartridges and leak diagnosis, are on our shower repair page. Basin and kitchen taps are on our tap and mixer installation page. The heater itself is on our water heater installation page, with tankless heaters and repairs separate. Baths, including steam and jacuzzi units, are on our bathtub page. Flexible hoses are on our hoses page, and stains on the ceiling below are on our ceiling and wall leak page.

Which shower: the choices that decide the rest

The type of shower fixes the pipework, the wall depth and what can go wrong later, so it is the first decision.

TypeWhat it isWhat it needsWatch for
Exposed mixer and barA valve on the wall with a visible rail, riser or barTwo supply connections and a wall that can take the fixingsThe simplest to fit, replace and reach
Concealed (in-wall) valveA valve body in the wall; only a plate and handle showPlanning before the tile goes on, and a wall that can be opened to reach itA fault in the body or the pipes behind it needs the wall opened. See the access section below
Rain shower (ceiling or wall arm)A large head, fixed above head heightEnough flow for a large head, a supply to the ceiling or an arm from the wallThe head's flow figure, which is on its data sheet
Hand shower and railA head on a flexible hoseA hose outlet and a holderSee our hoses page
Shower column or panelA single unit with the valve, head and sometimes body jets on one exposed faceHot and cold supply to a single pointFollow the product's own installation instructions
Electric or instant shower unitA small heater that warms water as it flowsA cold supply and an electrical supplyA heater decision. See our water heater installation and tankless pages
Steam or jacuzziA separate generator or pump systemSpecialist supply, drainage and electricsSee our bathtub page. We assess these before quoting

Two points about the table. First, the valve and the trim must be a pair. Make sure the valve body matches the trim kit. A trim made for one body will not fit another. Second, the type of valve decides what a later repair costs, because a concealed valve cannot be reached the way an exposed one can.

Replace a shower, add one, or fit out a bathroom

"Shower installation" covers jobs that are very different in scope. Naming the job first sets the price, the time and the permission needed.

JobWhat changesOpens the wall or floor?Permission to think about
Like-for-like head set or mixer swapA new exposed mixer, bar or head on the same connectionsNoMaintenance. Tell the landlord
New trim on an existing concealed valveA new plate and handle on the old bodyNoOnly if the new trim fits the old body. See the cartridge detail on shower repair
Replace a concealed valve body, same positionThe old body comes out and a new one goes inYes, the tile at the valveAsk the landlord in writing. Check building rules
New shower in a new positionNew supply, drain and waterproofingYes, wall and floorWritten consent, and building management approval
Tray or bath replaced with a walk-inNew floor build, drain and tankingYes, the floorAs above, and the ceiling below is at risk

A job at the top of the table can become a job lower down. A valve that will not come out, a wall that is wet behind the tile, or a drain that has to move all push a swap toward the opened-wall rows. We say so before opening anything, and we give the price of each route in writing.

Plan the wall before the tile goes on

A concealed valve is installed in two stages. The first fix is everything that goes inside the wall: the valve body, the supply pipes, the drain and the waterproofing. The second fix is everything that shows: the trim, the handle, the head, the hose outlet and the screen. The two stages sit either side of the tiler. A first-fix mistake cannot be corrected without breaking tile.

Valve depth

A valve body has to sit at the right depth behind the finished wall. The depth is measured from the finished wall surface, including tile, adhesive and grout, back to the valve, and each valve maker gives its own range. A valve roughed in too shallow cannot take its trim correctly, and one set too deep leaves the handle sitting in a hole. Temporary spacers or a depth gauge supplied with the valve can hold the offset while the tile is not yet on. Our practice:

  1. We read the valve's own template or manual and set the depth to that, allowing for backer board, adhesive and the tile you have chosen.
  2. We choose the tile before we fix the valve. The depth depends on the tile thickness. If the tile is changed after the valve is set, the depth is wrong.
  3. We hold the depth with the maker's spacers or gauge until the tile goes on, and test-fit the trim before the tile is grouted.
  4. We photograph and record the position of the valve and pipes before the wall is closed. The record also names the valve model, which makes any later cartridge replacement a measured job and not a guess.

Where things go

Position is a design decision, and it is easier to change on paper than in tile.

  • The valve. Place it where it is reachable from outside the spray, so you can turn the water on without standing in cold water. We set it with you.
  • The head. Set by who uses the shower. Rain heads on a ceiling arm need the supply routed to the ceiling.
  • The hand-shower outlet and holder. On a wall that can take the load, at a height you can reach.
  • Niches and shelves. Planned with the tile layout, since they cut into the wall.

Fixing the valve in the wall

In a masonry wall the valve is fixed with brackets to the block or to a support, and the pipes are chased in. The body must not move when the handle is turned or the trim is tightened. A valve that is loose in the wall tears its own joints.

Hot and cold are marked on the body. Reversed supplies are a first-fix error that shows only when the shower is run, so we check them at the pressure test.

Isolation valves and access panels

A concealed valve is only as repairable as the access to it. Valves concealed behind finished walls need an access plan, and the trim must not block the controls. We add two things.

  • An isolation valve on the shower's supply. With one, a repair to this shower shuts off this shower, not the flat. Without one, a cartridge replacement needs the main closed. The full account of isolation valves, including what to look for and how they fail, is on our valve repair and replacement page.
  • A panel behind the wall, where one can be fitted. A bathroom that backs onto a cupboard or a service shaft can have a panel on the dry side. A bathroom that does not has to be reached through the tile. We tell you which you have before the wall is closed.

Pipework and joints

The shower is connected to the existing supply, and the pipe should match what is there. Joints and fittings, including the problems that arise when metals or plastics are mixed, are on our pipe fittings page. If the existing pipe is in poor condition, a new shower on it inherits the problem, and a run that keeps failing is a repiping question. We tell you what we find when the wall is open.

The pressure test before the wall is closed

Before the wall is closed, the new pipework is tested at the pressure the pipe maker specifies and held long enough to show a weeping joint, and for longer where the wall is hard to reopen. A joint behind tile is a joint we want to have seen under pressure first.

Our own practice adds a flush. New pipework carries debris, and debris in a new cartridge scores it. We flush the lines before the cartridge and trim go on.

New bathroom with a glass shower and a freestanding bath

Tray, walk-in or wet room: three ways to build the floor

The floor of a shower does two things: it drains the water, and it keeps the water out of the building. The three builds differ in how they do both.

BuildHow it worksWhat we check
Tray and enclosureA pre-formed tray with its own fall sits on the floor, with a waste and trap below it, and a screen or door around itThe tray is level and supported, the waste is connected without leaks, and the screen is sealed to the tray
Walk-in with a tiled floorA tiled floor that falls to a drain, with a screen or noneThe fall, the drain, and the waterproofing under the tile
Wet room with a pre-formed formerA shaped base that gives the fall to the drain, with waterproofing and tile over itThe former is bedded solid, the drain outlet lines up, and the waterproofing laps the walls
Linear drainA long channel drain at one edge, so the floor falls one wayThe drain's position, the single fall to it, and access to clean the channel

Fall and drain

Water needs a clear fall to the drain. A fall that you can barely see is too gentle to be sure of draining, and a floor with too little fall leaves standing water that grows mould and stains grout. The fall is set before the tile, the tile follows it, and we check it by pouring water on the screed and watching where it goes. The correct fall for a given tile and drain is on the manufacturer's data sheet.

The top of the trap should be level and central to the tray. A trap you cannot reach will block one day, and the access for cleaning it is chosen now, not then. See drain unblocking.

Waiting between steps

A shower is not usable on the day the tile is grouted. Each product has its own waiting time: the waterproofing, the tile adhesive, the grout and the silicone. We follow the time printed on each product, and we do not fit the enclosure or switch the shower on until the last of them has passed. A wait is cheaper than a tray that leaks in week one, so we plan the days into the schedule and tell you the date the shower can be used.

Waterproofing and the flood test

Tile and grout do not make a floor watertight.

The principle is a continuous layer, with the joints and corners treated, under the tile. Corners and joints are where tape and sealer go, and we spend the most time there. If this layer fails, water can cross the slab and appear as a stain on the ceiling below, the situation our ceiling and wall leak page covers.

Testing before the tile

For new work, our practice is:

  1. Test the drain connection first, with water poured through it and every joint inspected, after the solvent weld has cured.
  2. Test the waterproofing before the tile, when a failure can be mended without lifting anything.
  3. Hold the water for the period the waterproofing manufacturer specifies, and no shorter. If the manufacturer gives none, we say so and agree a period with you.
  4. Check the room below for damp before the water is released.
  5. Record the result in the handover note.

Will your hot water and pressure feed the shower you chose?

A shower can be installed perfectly and still disappoint, because the shower asks more of the heater and the supply than the old one did.

The heater

Size the heater to the peak demand. For a storage heater, check how much hot water it can supply in a busy hour from full, and total the demand of that hour: showers, basins and kitchen use together. For a tankless heater, check the temperature rise it can deliver at a given flow, and add up the flows of the fixtures that may run at once. A full-flow head asks a lot of a small unit.

Three points apply to a Dubai shower:

  • Add the new shower's flow to what already runs together. A big head and a running tap can exceed a small heater. The flow figure is on the head's data sheet, and we ask for it before we size anything.
  • Temperature rise matters. In Dubai, our water heater page notes that water in rooftop tanks is already warm in summer. The rise needed is smaller then and larger in winter.
  • Hot water arrives later the further the heater is. A long pipe run cools the water, so a new shower far from the heater may run cold for longer than the old one nearer to it.

If the heater is the limit, the choices are in our water heater installation and tankless water heater pages. If the heater is already faulty, see water heater repair.

The supply

A rain head needs enough flow and enough pressure to spread the water. The data sheet states the minimum, and we check it against the pressure at your shower. A weak supply is a fault in its own right: see low water pressure, and booster pumps where a pump feeds the property. The opposite problem, too much pressure, is handled by a pressure reducing valve. In villas, a pressure reducing valve is normally fitted downstream of the meter where the supply pressure is high. See pressure reducing valves.

A mixer blends hot and cold, so the two supplies matter together.

Scald safety and thermostatic valves

  • A thermostatic mixing valve limits the outlet temperature at the shower, so the water cannot rise to a scalding level. Hot water stored hot in the heater is mixed down at the valve to a comfortable temperature.
  • Thermostatic valves reduce scald risk because they hold the set temperature when the supply changes, for instance when someone flushes a toilet or opens a tap elsewhere.
  • A child's skin burns far faster than an adult's, so test the water with your elbow or a thermometer before a child gets in.

For a new shower in a home with children or older people, a thermostatic valve is the safer choice, and the maximum temperature stop is set and recorded at commissioning.

Screens, doors and seals

The screen is the last big item and it decides whether water stays in the shower.

  • Fix to a true wall. A glass panel hung on a wall that is out of plumb leaves a gap at the top or the bottom. We check the wall and the tray with a level before ordering or fitting, and we tell you if a screen needs a packer or a wall repair.
  • Seal the right side. The silicone line goes on the outside of the channel so water cannot sit in it, and the inside edge is left clear for water to run into the tray.
  • Door swing and drain. A door that opens inward over the tray, or a screen that drops water outside the tray lip, is a flood waiting to happen. We set the screen where the splash lands inside the drain area.
  • Let silicone cure before the first shower. A seal that is wet in its first day peels and traps mould.
  • Clean and wipe. A squeegee after use and a rinse of the channel keep scale off the glass and the sealant in good order.

Mistakes we are called to correct

Most shower failures trace back to a few first-fix decisions. We see these often in Dubai flats and villas:

  • Valve set before the tile was chosen. The trim does not sit flat, and the handle floats or sinks into the wall.
  • Hot and cold reversed at the valve body, found only when the first shower runs.
  • No isolation valve, so a cartridge change shuts down the flat.
  • Tile laid over untested waterproofing, with the first sign of failure a stain on the ceiling below.
  • A drain with no fall, leaving standing water in the tray.
  • A rain head on a weak supply, chosen from a catalogue without a flow check.
  • Valve and trim bought separately and found not to match.

Every one of these is cheaper to prevent in the planning stage than to fix behind finished tile, which is why the order of work above puts the decisions and tests before the tile.

Heads, hoses and the last connections

The head, arm and hose are the second-fix parts, fitted after the tile. A hand shower hose should suit the outlet and the holder, and its washers and ends are the usual leak points. The choice of hose and its fittings is on our hoses page. Heads come with a stated flow rate, and the figure matters twice: for the heater, as above, and for how the shower feels. We fit a head the valve and supply can serve.

Tablet checklist held in a new bathroom beside a basin with the vanity open

The order of work for a new concealed shower

Each stage depends on the one before it, and several cannot be reversed without breaking tile. This is the order we follow. The sequence is ours; the waiting times are the products' own.

StageWorkTest or check before moving on
1Agree the type, the valve, the tile and the heights. Supply the valve's template and data sheetValve and trim are a matched pair. Tile thickness is known
2Permission. Landlord and building managementIn writing, before the wall is opened
3Strip and prepare. Remove the old shower, protect the floor, open the wall where neededWhat is behind the wall is recorded
4First fix. Set the valve at depth, run the supply, fit the drainPressure test the pipework. Flush the lines
5Waterproofing. Primer, membrane or boards, taped joints and cornersFlood test before tiling. Check the room below
6Tile and groutCure times per the product
7Silicone at the movement jointsCure per the product
8Cure and clean. Let the grout and silicone cure, then clean the surfacesCure per the product
9Second fix. Trim, handle, head, hose, screenTest-fit the trim before grouting, as above
10Commissioning. Hot and cold, flow, temperature stop, drain, leaksWritten handover

A job that skips the flood test at stage 5 pushes any failure to after the tile, where it costs the most to find. The repair-side tests, for when it has already happened, are on our shower repair page.

Permission in Dubai: landlord and building

Installing a shower in a rented flat is an alteration, so the landlord has a say, and in a managed building so does building management. This is general information, not legal advice.

Where a shower job falls

JobStarting point
Head set, hose, or exposed mixer swapped like for likeMaintenance. Tell the landlord, and keep the old part's details
Replace the concealed valve in the same positionAsk the landlord in writing. Check building rules on opening tile, working hours and contractor access
Move the shower, change a tray to a walk-in, or rebuild the floorWritten landlord consent, and building or facility management approval

We cannot tell you whether your building needs a certificate for a particular job. Building management can, and a request to them in writing is cheaper than a stopped job. Tell us what your building asks for and we work to it.

Warranty and the handover

What you should have in your hands when the job is finished:

  • A written note of what was installed: the valve brand and model, the trim, the head, the drain, and the pressure and flood tests with their results.
  • The valve model. With the model written down, a later cartridge replacement is a measured job. See shower repair.
  • Photographs of the pipework and waterproofing before the wall was closed.
  • The maximum temperature stop setting, if the valve has one.
  • The manufacturer's warranty terms for the valve and head, where they apply.
  • FAM's workmanship warranty, in writing. The warranty runs for 30 days and covers our labour only. Parts carry the manufacturer's warranty only.

How we install a shower

  1. You tell us what you want, and send a photo of the existing shower, the wall and the bathroom on WhatsApp. Include the model of any valve or head you have already bought.
  2. We visit, check the supply, the heater, the drain and what is behind the wall where we can see, and measure.
  3. We give options and a price in writing. Where the job opens a wall or floor, we say what we expect to find and what happens if we find something else.
  4. Check permission. In a rented or managed property, ask the landlord or building management whether they need to approve this work before the visit.
  5. We install in the order above, testing between stages.
  6. We commission and hand over: hot and cold, flow, temperature stop, drain, leak checks, and the written note.

Where we work in Dubai

We cover all of Dubai, including Dubai Marina, JBR, Downtown Dubai, Business Bay, Jumeirah Lakes Towers, Palm Jumeirah, Al Barsha, Jumeirah Village Circle, Dubai Hills, Mirdif, Deira and Al Quoz. See the full list of areas.

After the first week

After a new shower is fitted, check the seals, the drain and the ceiling below each day for a week. Look for damp at the base of the screen, a soft grout line or a stain below. Tell us if any damp appears within the 30-day workmanship warranty. A small leak at this stage is easy to put right, and a month of seepage behind a tray is not.

How much does shower installation cost in Dubai?

  • The fixtures. A head set and mixer, a concealed valve with trim, a rain head, a column, a tray and screen. If you supply your own, tell us before you buy so the valve and trim match.
  • Labour for the first fix. Setting the valve, running the pipes, fitting the drain.
  • Opening and closing. Tile removal, wall repair, access panel.
  • Waterproofing. Materials and the flood test.
  • Tile and finishing. If included.
  • Heater or pressure changes. A larger heater, a booster pump or a pressure reducing valve, if the supply cannot feed the shower.
  • Isolation valves and access.
  • Building fees. Any fees charged by the building for contractor access or a deposit are separate from our price.

We do not publish a starting price for this job. Send a photo on WhatsApp and we give you a fixed price before we start. Prices exclude 5% VAT.

Shower installation FAQs

Can I install a concealed shower valve in a rented flat?

You need the landlord's written approval first. Building management may have its own rules, so ask them as well.

Does my building need approval for a new shower?

We cannot say for your building. Building management or the owners' association may need to approve, and a villa community's master developer may have its own rules. Ask in writing what a shower job needs, and tell us what the building asks for. This is not legal advice.

How deep should the shower valve be set?

To the valve manufacturer's template, less the thickness of the tile, adhesive and backer board.

What is first fix and second fix?

The first fix is everything inside the wall: the valve body, pipes, drain and waterproofing. The second fix is everything that shows: trim, handle, head, hose and screen. Tile goes between them.

Do I need a thermostatic shower valve?

We recommend one, especially where there are young children or elderly people at home. A thermostatic valve holds the temperature you set when the supply changes, so a flush or a tap elsewhere does not turn the shower hot or cold. The maximum temperature stop is set and recorded at commissioning.

Can my water heater supply a rain shower?

Check the head's flow figure against the heater. A large head can exceed a small heater. See our water heater installation page.

How long before I can use a new walk-in shower?

Follow the waiting times printed on the waterproofing, adhesive, grout and silicone used. We give you the date the shower can be used, and we do not fit the enclosure until the products have cured.

How is a shower floor made waterproof?

A continuous membrane or tanking layer under the tile, with tape or sealer at the joints and corners, tested with water before tiling. We agree the flood-test duration with the waterproofing maker's instructions and with you.

Can you replace just the shower head and mixer?

Yes. A like-for-like swap of an exposed mixer, bar or head set on the existing connections does not open the wall. We check the connections and the supply, and test for leaks and drips.

What happens if you find a leak when the wall is opened?

We stop, show you, and give a price for the repair before going on. A leak in the wall pipe is a pipe repair, as on our pipe leak repair page, and a pipe that keeps failing is a repiping question.

Book a shower installation in Dubai

Tell us what you want to install, whether you have bought the valve and head, whether the shower is on a wall or in a tray or walk-in, and whether you rent or own. Photos of the bathroom and any model numbers help. We will check the supply and hot water, plan the wall and floor, and give you the price and the steps in writing.